I've been experimenting with time-blocking for two months now, and my output has genuinely increased, but I'm not sure if it's the method or just the novelty effect wearing off. Do you find that structured scheduling actually boosts your productivity long-term, or does it eventually feel like yet another constraint that steals flexibility?